What is a change order?
A change order is a written amendment to a construction contract that changes the scope of work, the price, the schedule – or all three. It is used whenever the owner asks for something different, the design changes, or the contractor finds conditions nobody could see when the job was priced, such as rot, hidden wiring or poor soil. Signed by both parties before the work is done, a change order is the contractor's protection against unpaid extras and the owner's protection against surprise bills.
What a change order should include
- A change order number, the date and a reference to the original contract or estimate
- The project name and address, and the owner and contractor
- A description of each change – what is added, removed or substituted
- The cost or credit for each item, including labor, materials, subcontractors and markup
- The reason for the change (owner request, design change, hidden condition)
- The contract sum: original amount, previous change orders, this change and the revised total
- Any change to the schedule – days added and the revised completion date
- Signatures and dates from both parties
Change order example
| Item | Amount |
|---|---|
| Island cabinets, 6 ft × $310 | $1,860.00 |
| Prep sink and plumbing (subcontractor) | $1,650.00 |
| Replace subfloor, 40 sq ft × $9.50 | $380.00 |
| Credit – under-cabinet lighting removed | −$480.00 |
| Pendant lights, 3 × $240 | $720.00 |
| This change order | $4,130.00 |
Enter credits as a negative unit cost so the change order total and the revised contract sum are right. Price added work the same way you priced the original job – the construction estimate calculator adds overhead, contingency and profit.
How change orders work on a project
- Identify the change – the owner asks for it or the contractor finds a condition that needs it.
- Price it – the contractor prepares a change order with the cost and time impact.
- Approve it – both parties sign before the extra work starts. Many contracts say unsigned changes are not payable.
- Do the work and track it separately.
- Bill it – list the change order by number on the next progress invoice. See the construction invoice template.
Tips to avoid disputes
- Never start extra work on a verbal OK – a text or email is better than nothing, but a signed change order is best.
- Number change orders in sequence and keep a running log of the revised contract sum.
- Include the time impact; disputes about delays are as common as disputes about money.
- If a change order is disputed, use a "construction change directive" or written notice under your contract so the work can continue while the price is agreed.
Frequently asked questions
What is a change order in construction?
A signed amendment to the construction contract that changes the scope, price or schedule of the work – for example adding an island to a kitchen remodel or replacing hidden rotten framing.
Who signs a change order?
Both the owner (or the owner's authorized representative) and the contractor. Subcontractor change orders are signed by the general contractor and the subcontractor.
How do I show a credit on a change order?
Add a line for the deleted work with a negative unit cost. The total then reflects both added work and credits.
Can a contractor charge for work without a signed change order?
It depends on the contract and state law, but many contracts require written change orders for any extra payment, so unsigned extras are often hard to collect. Get every change signed before doing the work.