Example excavation estimate
This sample excavation estimate has 7 line items and a subtotal of $6,765.50 before markup, contingency and tax – split into equipment $3,840, labor $1,906, other $1,020. The same lines are pre-filled in the generator above and in the Excel file, so you can see the format and replace them with your own quantities and prices.
| Item | Qty | Unit | Unit cost | Amount |
|---|---|---|---|---|
| Mobilize excavator and skid steer | 1 | ls | $750.00 | $750.00 |
| Excavator with operator | 6 | hr | $145.00 | $870.00 |
| Excavate and load | 107 | cu yd | $6.50 | $695.50 |
| Dump truck haul-off | 12 | load | $185.00 | $2,220.00 |
| Disposal / tipping fee | 12 | load | $85.00 | $1,020.00 |
| Backfill and compact | 40 | cu yd | $14.00 | $560.00 |
| Fine grading | 1 | ls | $650.00 | $650.00 |
| Subtotal | $6,765.50 | |||
Sample rates for illustration only – prices vary by region, season and supplier. Use your own costs.
Sample scope and terms: Scope: excavate for 24 × 30 ft addition foundation to 4 ft depth, haul off excess soil, backfill and compact around foundation after walls are complete, and fine grade. Price assumes normal soil; rock, groundwater or buried debris billed at equipment hourly rates. Utility locate requested before digging. Price valid 30 days.
How to estimate a excavation job
Excavation is priced by volume and equipment time. Bank volume (the hole) = length × width × depth ÷ 27. Excavated soil expands, so multiply by a swell factor – roughly 1.2–1.3 for common soils – to get loose volume, then divide by truck capacity for the number of loads. Add mobilization, haul-off, disposal fees, backfill and grading.
Excavation volume takeoff – worked example
| Measurement | Value |
|---|---|
| Length | 30 ft |
| Width | 24 ft |
| Depth | 4 ft |
| Swell factor | 1.25 |
| Truck capacity | 12 cu yd |
| Bank volume | 107 cu yd |
| Loose volume | 134 cu yd |
| Truck loads | 12 loads |
| Excavator hours (at 18 cu yd/hr) | 6 hr |
Change the 18 cu yd/hr production rate in the formula to match your machine and soil.
The Excel template has this calculation on its Takeoff sheet: type your measurements and the quantities on the estimate update automatically.
What to include in a excavation estimate
- Dimensions and depth of excavation
- Cubic yards (bank and loose) and number of truck loads
- Equipment and operator hours
- Haul-off, disposal and dump fees
- Backfill, compaction and grading
- Rock, water and buried-debris terms; utility locate
Excavation estimating tips
- Use a swell factor – a 100 cu yd hole fills more than 100 cu yd of trucks.
- Price rock and groundwater as hourly rates, not fixed prices.
- Always request a utility locate before digging.
- Include mobilization even on small jobs; moving equipment costs money.
What is in the free excavation estimate Excel template
- Estimate sheet – your details, client and job site, estimate number, date and valid-until date, and 20 line-item rows with quantity × unit cost formulas.
- Totals – subtotal, optional overhead & profit markup, contingency, discount, sales tax, estimated total, deposit and balance due.
- Cost breakdown – labor, materials, equipment, subcontractors and other costs, totaled automatically and kept outside the print area.
- Takeoff sheet – excavation volume takeoff with the formulas shown above, linked to the estimate.
- Scope, exclusions & terms box and signature lines for you and the client, plus a How to use sheet.
It opens in Microsoft Excel, Google Sheets, Apple Numbers and LibreOffice, prints on one page and saves to PDF. Download the excavation estimate template (.xlsx).
How to use the online excavation estimate generator
- Replace the sample line items with your quantities and unit costs – the totals update as you type.
- Add your business, the client and the job site, edit the scope and exclusions, and set the valid-until date.
- Download the PDF with signature lines and send it. When the client accepts, click Convert to invoice.
Not sure about markup? Work out overhead, profit and contingency with the construction estimate calculator and check your margin with the markup calculator. For changes after the job starts, use the change order generator.
Frequently asked questions
What is a swell factor in excavation?
The increase in volume when soil is dug up and loosened. Many common soils swell 20–30%, so multiply bank cubic yards by about 1.2–1.3 to plan truck loads.
How do I calculate truck loads of dirt?
Loose volume ÷ truck capacity. A tandem dump truck often carries about 10–14 cu yd depending on the truck and material weight.
Who pays if rock is found?
The estimate should say. Most contractors exclude rock and price it at an hourly equipment rate if found.
Is this excavation estimate template free?
Yes. Download the Excel file or fill in the estimate online and download a PDF – free, with no sign-up and no watermark.
Does the Excel template work in Google Sheets?
Yes. Upload the .xlsx file to Google Drive and open it with Google Sheets, or open it in Apple Numbers or LibreOffice. The formulas work in all of them.
Can I turn the estimate into an invoice?
Yes. In the online generator, click "Convert to invoice" once the client accepts – the client and line items carry over. In Excel, copy the accepted lines into the free invoice template.