Framing Estimate Template

Price wall, floor and roof framing by the square foot or board foot with studs, plates, headers, sheathing and labor.

Exterior & structural
  • 100% free
  • No sign-up
  • Invoices stay in your browser
  • Instant PDF

Framing estimate template for Excel

Formulas for line totals, markup, contingency, tax and deposit, plus a takeoff calculator. Works in Excel, Google Sheets and Numbers.

Download .xlsx

Or fill it in online and download a PDF:

Fill in your quote

AIFill this in for meDescribe the job, or copy any invoice from a photo

Text and photos you use here are sent to our AI provider (Cloudflare) to be read, then discarded. Everything else stays in your browser.

Contractor (you)

PNG, JPG, WebP or SVG. Appears on all your documents. Stays in your browser only.

Client / job site

Details

Line items

DescriptionQtyRateAmount

Tip: items you use are remembered – start typing a description to pick a saved item and its price.

Totals

Customize: language, brand color, extra fields

Printed in its own box on the document. Saved with your other business details.

Signature & payment

Shown on the document as a "Pay online" link so clients know where to pay.

Saved documents appear in My documents, with the next number filled in automatically. Everything stays in your browser – nothing is uploaded. "Download PDF" saves a ready-made PDF file; "Print" opens your printer dialog.

Example framing estimate

This sample framing estimate has 8 line items and a subtotal of $13,911.70 before markup, contingency and tax – split into labor $7,723, material $4,939, equipment $1,250. The same lines are pre-filled in the generator above and in the Excel file, so you can see the format and replace them with your own quantities and prices.

ItemQtyUnitUnit costAmount
Wall framing labor186lin ft$18.00$3,348.00
Studs – 2 × 6 × 9 ft194ea$9.50$1,843.00
Plates – 2 × 6558lin ft$1.15$641.70
Headers – LVL / built-up8ea$95.00$760.00
Wall sheathing – 7/16 in. OSB58sheet$18.00$1,044.00
Nails, hangers, straps and anchors1ls$650.00$650.00
Crane / lift for roof trusses1day$1,250.00$1,250.00
Set trusses and sheath roof1,250sq ft$3.50$4,375.00
Subtotal$13,911.70

Sample rates for illustration only – prices vary by region, season and supplier. Use your own costs.

Sample scope and terms: Scope: frame exterior and interior walls for single-story addition per plans dated 10/20/2026, 2 × 6 exterior walls at 16 in. on center, headers per plan, OSB wall sheathing; set engineered trusses and sheath roof. Lumber prices are as of the estimate date and may be adjusted if supplier prices change more than 5% before order. Excludes windows, doors and roofing. Price valid 15 days.

How to estimate a framing job

Framing is estimated from the plans: wall length for studs and plates, floor and roof area for joists, trusses and sheathing. For walls, take the length × 12 ÷ stud spacing, add one per wall, then extra studs for corners, intersections and openings (king and jack studs). Plates are three times the wall length (one bottom, two top). Sheathing is the wall area ÷ 32 per 4 × 8 sheet. Labor is often priced per linear foot of wall or per square foot of floor.

Wall framing takeoff – worked example

MeasurementValue
Total wall length186 ft
Wall height9 ft
Stud spacing16 in
Number of wall segments12 ea
Openings (windows + doors)14 ea
Studs (incl. 3 extra per opening)194 ea
Plate lumber558 lin ft
Sheathing sheets (exterior)58 sheets

Sheathing count uses the whole wall length; use only exterior walls if interior walls are not sheathed.

The Excel template has this calculation on its Takeoff sheet: type your measurements and the quantities on the estimate update automatically.

What to include in a framing estimate

  • Plan set and revision date
  • Wall lengths, height, stud size and spacing
  • Headers, beams and engineered lumber
  • Floor system, roof trusses or rafters
  • Sheathing and fasteners, hold-downs and straps
  • Lumber price adjustment clause and crane or lift costs

Framing estimating tips

  • Lumber prices move fast – add a price-adjustment clause and a short validity date.
  • Count king, jack and cripple studs at each opening; they add up.
  • Ask the truss supplier for a delivered quote and add crane time.
  • Check the plans for engineered hold-downs and shear walls – they add labor.

What is in the free framing estimate Excel template

  • Estimate sheet – your details, client and job site, estimate number, date and valid-until date, and 20 line-item rows with quantity × unit cost formulas.
  • Totals – subtotal, optional overhead & profit markup, contingency, discount, sales tax, estimated total, deposit and balance due.
  • Cost breakdown – labor, materials, equipment, subcontractors and other costs, totaled automatically and kept outside the print area.
  • Takeoff sheet – wall framing takeoff with the formulas shown above, linked to the estimate.
  • Scope, exclusions & terms box and signature lines for you and the client, plus a How to use sheet.

It opens in Microsoft Excel, Google Sheets, Apple Numbers and LibreOffice, prints on one page and saves to PDF. Download the framing estimate template (.xlsx).

How to use the online framing estimate generator

  1. Replace the sample line items with your quantities and unit costs – the totals update as you type.
  2. Add your business, the client and the job site, edit the scope and exclusions, and set the valid-until date.
  3. Download the PDF with signature lines and send it. When the client accepts, click Convert to invoice.

Not sure about markup? Work out overhead, profit and contingency with the construction estimate calculator and check your margin with the markup calculator. For changes after the job starts, use the change order generator.

Frequently asked questions

How many studs do I need per foot of wall?

At 16 in. on center, about 0.75 studs per linear foot plus one per wall, then extras for corners, intersections and openings. Many framers simply use one stud per linear foot as a quick estimate.

How do I estimate plates?

Multiply the wall length by three – one bottom plate and a double top plate.

Why do framing estimates have a short validity period?

Lumber prices change frequently, so framers often hold prices for 7–15 days or include a price-adjustment clause.

Is this framing estimate template free?

Yes. Download the Excel file or fill in the estimate online and download a PDF – free, with no sign-up and no watermark.

Does the Excel template work in Google Sheets?

Yes. Upload the .xlsx file to Google Drive and open it with Google Sheets, or open it in Apple Numbers or LibreOffice. The formulas work in all of them.

Can I turn the estimate into an invoice?

Yes. In the online generator, click "Convert to invoice" once the client accepts – the client and line items carry over. In Excel, copy the accepted lines into the free invoice template.

Send a professional invoice in minutes

30 designs, your logo, instant PDF. Free forever – no sign-up, no watermark.